          Mauna Loa Solar Observatory Observer's Log 
-----------------------------------------------------------------------------
       Mon Mar 24 16:49:10 GMT 2014
Year: 14  Doy: 083
Observer: berkey
WEATHER COMMENT: berkey: Mon Mar 24 16:49:13 GMT 2014
temp 33f, wind 6mph from the south, clear skies, road very icy and foggy below 9,500ft. Weak marine layer with heavy rain to the east.
___end___
Mon Mar 24 17:09:26 GMT 2014: PSPT Start Patrol
Mon Mar 24 17:10:37 GMT 2014 COMP Start Patrol
Mon Mar 24 17:30:24 GMT 2014 KCOR Start Synoptic Patrol
GENERAL OBSERVATORY COMMENT BY berkey: Mon Mar 24 17:29:00 GMT 2014
Kcor and comp see a lot of sky brightness.

___end___
Mon Mar 24 17:45:03 GMT 2014 KCOR End Patrol
Mon Mar 24 17:44:06 GMT 2014 COMP End Patrol
Mon Mar 24 18:08:25 GMT 2014 KCOR Start Synoptic Patrol
Mon Mar 24 18:07:41 GMT 2014 COMP Start Patrol
GENERAL OBSERVATORY COMMENT BY berkey: Mon Mar 24 18:09:17 GMT 2014
Mauna Kea summit just got swamped with clouds.
___end___
Mon Mar 24 19:01:51 GMT 2014: PSPT Start Patrol
Mon Mar 24 19:25:59 GMT 2014 COMP End Patrol
Mon Mar 24 19:26:00 GMT 2014 COMP Start Patrol
Mon Mar 24 20:44:18 GMT 2014 COMP End Patrol
Mon Mar 24 20:44:19 GMT 2014 COMP Start Patrol
Mon Mar 24 21:01:17 GMT 2014 COMP End Patrol
Mon Mar 24 22:03:42 GMT 2014 COMP Start Patrol
Mon Mar 24 22:11:19 GMT 2014 KCOR Start Synoptic Patrol
Mon Mar 24 22:33:48 GMT 2014 KCOR End Patrol
Mon Mar 24 22:32:46 GMT 2014 COMP End Patrol
GENERAL OBSERVATORY COMMENT BY berkey: Mon Mar 24 23:00:45 GMT 2014
Couple groups came up this morning.

Gave a tour to an Austrailian highschool group.   Then Matt, Mac, Scott, and Chris came up for building inspection.  
Matt has a much better idea what the site is like and how things happen here.  Scott should be returning in 2(ish) weeks for some more inspections/measuremnets where they make start doing some destructive work in the control room ceiling to understand how the roof is constructed.

We talked a bit about dome work.  It sounds like the plan that will be put forward is for HAO staff to remove senstitve equipment pin then pin the spar verticl.  At which time a contractor will build a 2x4/plywood box around spar/instruments.  Then HAO staff would be restricted from entering the dome; during construction/asbestos mitigation walls and floor.  Concurrently with asbestos work the new dome would be built and then replaced before the spar's box is removed.   This 2ish week period would likely be the only major loss of observing time during the work.  For the downstairs/pspt area work; the plan will likely involve doing the room in stages so we dont need to remove all the the equipment; and depending on the job observing in the morning then letting the contractors work in the afternoon.

___end___
Tue Mar 25 00:14:38 GMT 2014 COMP Start Patrol
Tue Mar 25 00:17:05 GMT 2014 KCOR Start Synoptic Patrol
Tue Mar 25 00:17:46 GMT 2014 KCOR End Patrol
GENERAL OBSERVATORY COMMENT BY berkey: Tue Mar 25 00:18:12 GMT 2014
Sucker hole
___end___
Tue Mar 25 00:31:32 GMT 2014 KCOR Start Synoptic Patrol
Tue Mar 25 00:31:55 GMT 2014 KCOR End Patrol
Tue Mar 25 00:31:40 GMT 2014 COMP End Patrol
Tue Mar 25 01:13:55 GMT 2014: PSPT Start Patrol
Tue Mar 25 01:48:36 GMT 2014: PSPT Abort Patrol
Tue Mar 25 01:48:40 GMT 2014: PSPT Abort Patrol
GENERAL OBSERVATORY COMMENT BY berkey: Tue Mar 25 01:58:29 GMT 2014
Fog just west of the lava berm
___end___